SMART-1 is working well and continues thrusting



SMART-1 is working well and continues thrusting
28 Nov 2003 14:19

overall status, current activities and planned activities
The spacecraft is now in its 120th orbit and has continued to function very well. As 
in previous weeks, the spacecraft was operated in electric propulsion mode almost 
continuously - only interupted during eclipse periods. 



>From the beginning of this week, however, eclipse periods are no longer experienced 
>and we can now maintain constant thrust. Although we have substantially increased the 
>perigee SMART-1 is still crossing the radiation belts.  It has been decided, 
>therefore, to keep the no-thrust limit of 10 000 km to avoid possible problems caused 
>by the ongoing high radiation environment. As a matter of fact, the solar activity is 
>still quite high: two energetic solar flares on 18 November produced a cloud of 
>ionised gas 
that impacted Earth on 20 November producing a severe geomagnetic storm that lasted 
for about twenty-four hours. Despite this environment, however, SMART-1 has managed to 
pass through unharmed. 

The total cumulated thrust time is now more than 760 hours and we have consumed about 
12.5 kg of Xenon fuel. The electric propulsion engine performance, periodically 
monitored by means of the telemetry data transmitted by the spacecraft and by 
radio-tracking by the ground stations, has shown in the last period a slight reduction 
with respect to previous over performance in thrust and is now at about +1.3%. This is 
due to early adjustments to the working conditions of the engine. In this period a 
series of 
tests were performed on the engine with excellent results. The redundant cathode B has 
been commissioned and proved to be functioning very well.  Its performance was 
identical to the operational cathode A, which has been functioning for more than 700 
hours and shows no degradation. 

A new procedure to immediate ignite at full thrust has also been validated. We have 
made ground tests to establish the cause of the earlier flame-out events. The cause of 
the problem has been identified in an electronic component which, under the effect of 
a single event upset caused by radiation, erroneously sets the voltage reference to 
zero -  hence triggering the flame-out detection. We have now prepared a procedure to 
automatically detect these events and restart the engine autonomously. 

The electrical power produced by the solar arrays continues to be affected, as 
expected, by the radiation environment. We are now analysing, in more detail, this 
behaviour by taking into account the fact that the solar irradiance is slightly higher 
now, due to Earth perihelion on 3 January, compared with launch. According to the 
latest SOHO measurement there has been an increase in the solar constant by about 2.7% 
over this period.  The solar arrays have reduced their power output, due to radiation 
degrada
tion, by about 82 W from the initial 1850 W (a fall of ~4.6%). From a preliminary 
analysis, it seems that roughly 1% of the degradation can be attributed to the recent 
solar flare events. Taking into account the increase in solar irradiance, the net loss 
is about 7.3% in 60 days or 0.12% per day. This degradation should last until the 
trajectory crosses the radiation belts, roughly mid-to-end of December. At this rate 
the solar arrays will have lost about 130 W at the exit of the radiation belts; after 
tha
t the degradation should be minor. Due to the built in power margins this will allow 
the spacecraft to continue thrusting at full power and shorten the time envisaged to 
reach the Moon. A more detailed analysis on the power degradation is currently being 
performed and more results will follow shortly. Stay tuned. 

The communication, data handling and on-board software subsystems have been performing 
very well in this period. 

The thermal subsystem also continues to perform well and all temperatures are as 
expected. The only item still of concern is the optical head temperature on one of the 
star tracker's, which is too high (~17 °C) during parts of the orbit. The momentary 
loss of attitude determinations has been, as previously, up to 300 times per day for 
an average time of only one second. There are no negative consequences arising from 
this problem.  There is another star tracker, which provides good attitude 
determination, 
and the system is anyway capable of coping with much longer periods without both star 
trackers. The thermal engineers have now envisaged ways of partially reducing the 
temperature of the star tracker optical heads. More on this in the next report. 


Orbital/Trajectory information

The SMART-1 orbit is continuously modified by the effects of the electric propulsion 
low thrust. The osculating orbital elements are periodically computed by the ESOC 
specialists. These elements define the so called osculating orbit which would be 
travelled by the spacecraft if at that instant all perturbations, including EP thrust, 
would cease. So it is an image of the situation at that epoch. In reality the path 
travelled by the spacecraft is a continuous spiral leading from one orbit to another. 
The mos
t recent osculating elements are as follows: 
EPOCH (UTC) 2003/11/24 05:50:07.6

Elements WRT Earth (J2000)  
Pericentre Distance (km) 11790.401694
 
Apocentre Distance (km) 47699.033805
 
Semi Major Axis (km) 29744.717749
 
Eccentricity 0.603614
 
Inclination (deg) 6.837486
 
Asc. Node (deg) 154.885580
 
Arg. of Pericentre (deg) 204.387331
 
True Anomaly (deg) 180.031927
 
Osc. Orbital Period (h) 14.181536
 


 
SMART-1 orbit up to 24-11-2003
 

In this diagram the GTO, the osculating orbits at launch and at different times are 
plotted. The large orbit, marked 'final', is the one we expect to achieve at the end 
of the radiation belt escape in about one month. 

>From the start, the electric propulsion system has managed to increase the semi-major 
>axis of the orbit by 5115 km, increasing the perigee altitude from the original 656 
>km to 5412 km and the orbital period by three and a half hours, from the initial 10 
>hours 41 minutes to the present 14 hours 10 minutes. 

Contact Point
Giuseppe Racca
SMART-1 Project Manager 
ESA/ESTEC - SCI-PD 
Keplerlaan 1- 2200 AG Noordwijk, The Netherlands 
E-mail: Giuseppe.Raccaesa.int




Jacques :-)

Editor: www.spacepatches.info




<-- __Chronological__ --> <-- __Thread__ -->


Usenet.com



Please check out one of the premium Usenet Newsgroup Service Providers below for access to Usenet.